Project Summary
Construction commenced in 2023 on the O’Chiese First Nation Powwow Arbour, now serving as a venue for large ceremonies and gatherings. This project primarily involved reconstruction, incorporating enhancements to improve both design and functionality.
The arbour is designed as an open-air structure, maximizing natural light and ventilation. It features a circular layout with beams, columns, and bleacher railings, utilizing a total of 568,791.15 lbs of steel.
Location: Rocky Mountain House, Alberta

